메뉴 건너뛰기

이오렉스 로고


APPLICATION

Clean and safe water supply from the water purification plant to the home


INDUSTRIAL

Scales are the enemy of plants! Let IOREX solve the problem.


Scales are unsolved homework for plants at home and abroad. Scales damage the industrial facilities. They must be removed and prevented.

Most industrial facilitiesuse hard watersuch as underground water.

The harder the water is,the faster the scales are generated.

IOREX can solve this issue with a single installation.

Scale Hunter, IOREX!

If scales get stuck?

  • Shortened equipment life
  • Degraded thermal efficiency & increased fuel costs
  • Work interruption caused by frequent equipment failures
  • Increased pipe leaks

After installing IOREX?

  • Prolonged equipment life by removing scales
  • Enhanced thermal efficiency and reduced fuel costs
  • Reduced equipment management expenses and enhanced productivity
  • Prevention of pipe leaks

Application area

  • Boiler
  • Cooling Tower
  • Heat Exchanger
  • Water Tank
  • Other pipelines

Scale Prevention effect in Alcom, Malaysia after IOREX

Installation Place
Alcom, Malaysia
Installation date
January, 2006
Effect
Scale is notably reduced in 8 months after IOREX installation

IOREX effect at the square cooling tower of Dr.Chung’s Food Co., Ltd.

Installation Place
At the square cooling tower of Dr.Chung’s Food Co., Ltd.
Installation date
Nov 30, 2019
Verification Date
Mar 9, 2020
Effect
The inside of the cooling tower has become very clean within 100 days after IOREX installation.

Main Customer

  • samsung
  • gscaltex
  • hyundai heavy industry
  • posco
  • dongheeauto
  • donga
  • komipo

Installation Excamples

  • GS caltex

    GS Caltex

  • industrial pipe

    Byeoksan

  • cooling tower

    Dr.Chung's Food

  • industrial

    Hansolpaper